| Task B.2.13.2 |
|
|||||
|
Radar Tower in Poznań |
|||||
|
Foundation works
|
|||||
|
Trial assembly of the lower section of the tower
|
|||||
|
Trial assembly of the upper sectrion of the tower
|
|||||
|
Detail of structure node
|
|||||
|
Hot galvanising of the tower elements
|
|||||
|
Elements after galvanising
|
|||||
|
Commencement of assembly of the lower section of the tower
|
|||||
|
Parallel assembly of upper and lower section of the tower
|
|||||
|
Crushing of concrete samples
|
|||||
|
Advanced parallel assembly
|
|||||
|
Both sections of the tower assembled Cladding commenced
|
|||||
|
Transport of the upper section to its destination
|
|||||
|
Upper section of the tower set up
|
|||||
|
Ring under Radar Dome. Insulation works
|
|||||
|
Fragment of structure as seen from inside
|
|||||
|
Radar Tower Structure Completed
|
|||||
|
Radar Tower in Rzeszów |
|||||
|
Foundation cut
|
|||||
|
View of the tower
|
|||||
|
Radar Tower in Świdwin |
|||||
|
Foundation works
|
|||||
|
Foundation completed and access road under construction
|
|||||
|
Parallel assembly of two sectionsof the tower
|