Emergency Flood Recovery Project - B.2 Component
- SMOK Project
FIRST SMOK SYSTEM INTEGRATION SEMINAR
October 2002
TASK B.2.13.2 PRESENTATION OF TASKS OF THE CONSULTANT
The objectives of work of Consultants (i.e. Consortium consisting
of WS Atkins-Polska and Hydroprojekt Warszawa is to provide technical
assistance to IMGW in the supervision and final certifications of all
construction works that will be carried out under each of sub-components
of the work. This work has been divided into 3 Phases, which consider
the complete investment process from the approval of technical designs
to the issue of a Completion Certificate for each separate construction.
Assistance is sought for the supervision of the following
constructions:
1. B2.1.3. Country-wide network of hydro- and meteorological
monitoring facilities (about 1100 in number), comprising;
a. 516 hydrometrical stations
b. 246 precipitation measuring stations
c. 217 meteorological stations
d. 60 automated synoptic stations
e. Regional Data Collecting Centers
f. radio repeaters and re-transmitting stations
g. 30 stations for measurement of the ground
water level
2. B2.7.5 Laboratory modernization
3. B2.8 Storm and Lightening detection system
4. B2.9 Enhancement of the weather radar system, comprising
a. 5 new radar towers (in Rzeszów, Tarnów, Poznań,
Gdańsk and Świdwin
b. adaptation of existing radar tower in Legionowo
c. construction of Main Radar Operational Centre
MROC in Warsaw.
The Consultant is acting as IMGW's substitute including
the activities of the Investor's Supervising Inspectors, as it is stipulated
by Polish Building Law in respect of the Investor's supervisory service.
Also it is responsibility of the Consultant to assist the Client's Project
Managers with respect to any responsibilities concerned with construction
at the various sites.
The duties of the Consultant are listed below and have
been divided into phases to reflect the investment and construction
process:
PHASE 1 Pre-construction Investor's activities, preceding
field execution of the Project
a. Review of the technical documentation (designs
and specifications) submitted by the consultant/contractor for contract
B2.1.3, described as measurement stations, and contract B2.9, described
as weather radar system, as to the;
- completeness
- technical correctness
- conformity with formal requirements
b. Assistance in the creation of the tender
documentation for task B.2.1.3 and ensuring these conform with the World
Bank procedures for supply and installation contracts:
c. Assistance in completion of the formalities in name of the Client
and/or the owners of the land where the construction sites are to be
located, including obtaining construction permissions, where required
under binding legislation.
PHASE 2 Engineering and construction supervision
This phase is concerned with the provision of support through construction
supervision of the following sub-components: B.2.1.3, B.2.7.5, B.2.8.2
and B.2.9.2. Although supervision will be over the entire works related
to construction responsibilities, will include in particular supervision
over:
a. location of measurement points, towers etc
b. execution of building structures
c. steel construction and their assembly
d. installation of measuring and other apparatus
e. wiring and other systems.
During execution of these tasks the Investor's Supervisor is coordinating
and authorizing, on behalf of the Client, any activities related to
the introduction of changes in the Technical Design, which are required
or recommended from point of view of the interest of the Client or users
and have been introduced on the initiative of the Investor's Supervisor,
the Contractor/Supplier or the Design Supervisor.
PHASE 3 Support in testing and commissioning and facilities
take-over
This phase is concerned with the take-over, commissioning
and inspection of completed facilities on behalf of the IMGW. In this
phase responsibilities include:
a. participation in the technical testing, inspections
and partial taking-over of various sub-components
b. participation in testing before commissioning
c. confirmation of completion certificates
d. supervision during Defects Liability Period,
including confirmation of the defect remedy.
The Consultant also shall carry out activities related
to ensuring the payments are made in accordance with the contracts and
real progress of construction work and any other services on behalf
of IMGW as the Consultant may consider necessary and the Client approve
for execution of the Monitoring and Flood Protection System, or as shall
be recognized as such by IMGW.
Attached are the photographs of two recently completed
and commissioned objects;
1. Radar tower in Legionowo
2. MROC in IMGW building, Podleśna Str.
Additionally the photographs concerning test assembly
of steel structure of radar tower for Rzeszów in Mostostal steel factory
in Zabrze are presented.
|