FIRST SMOK SYSTEM INTEGRATION SEMINAR




Presentation of Task B.2.1.2

B.2 Component
Monitoring, Forecasting and Warning System
Institute of Meteorology And Water Management
Debe/Warsaw, 9th & 10th October 2002
B.2.1.2smok.gif - 3871 Bytes


Organization of the Task

Task B.2.1.2:
  • Objectives : Design of The Hydrological & Meteorological Telemetry network
  • Leaders from IMGW side Roman Skapski
    Aleksander Kruszewski
    Piotr Cygan
  • Contractors : Consortium Project Automation-Signalco Project Manager: Alberto Moreo (P.A) Deputy Project Manager :Krzystof Pierzchala (Si)


Content

  • Phases of task
  • Organization of the Task
  • Current State and main future events
  • Scope of the task B 2.1.2
  • Functional Configuration
  • Equipment and software
  • Operation and Maintenance
  • Inter-relation with other Tasks
  • Conclusions & Questions


Phases of task

  • Phase 1:
    • Preliminary design
  • Phase 2:
    • Technical Design
  • Phase 3:
    • Bidding documents
    • Final design
    • Estimation of costs
  • Phase 4:
    • Finalisation of all land tenure & permission of use
  • Phase 5:
    • Supervision of implementation (B 2.1.3)


Current State and main future events

B.2.1.2wykres.gif - 8132 Bytes


Functional Configuration

B.2.1.2konf.gif - 10457 Bytes


Functional Configuration

B.2.1.2konf.gif - 10457 Bytes


Functional Configuration

MAIN FUNCTIONS

RTU
Signal conditioning
-Data acquisition
-Local data processing:
  -averaging
  -statistical analysis
  - derived measurement
-variations
-Self test
-RTU component test
-Sensors test
DCS
-Periodic RTU data reading
-Local Data Base (*)
-Data visualization (*)
-Station Maintenance
-RTU Tele programming
-Field Network Maintenance
-Fault Tolerant
-Synchronization
RBO
-Periodic DCS data reading
-Local Data Base
-Data visualization
-Station Maintenance
-RTU Tele programming
-Backbone Network Maintenance
-Fault Tolerant
-Synchronization
-DCS Maintenance
-DCS Tele-programming
(*) Optional function based on operative need


Scope of the task B 2.1.2

  • Technical design for the full national network
    • Communication network
    • RBO
    • DCS
    • Remote Post (meteorological & hydrological posts)
  • Verification of all telemetry posts
  • Estimation of implementation and exploitation costs
  • Formal and agreement related to land take over
  • Preparation of the Technical Specification for the implementation of the system (B2.1.3 project)


Equipment and software

B.2.1.2wyposazenie.gif - 16634 Bytes


Equipment and software

  • Repeater
    • Communication equipment
  • Posts
    • Communication equipment
    • Datalogger
    • Sensors (meteorological and/or hydrological)
    • Row data elaboration and storing software
    • Power management software
    • Communication software


Equipment and software

  • DCS
    • Elaboration unit
    • Field communication equipment (radio, GSM , PSTN, Satellite)
    • Backbone communication equipment (WAN ISDN, Satellite)
    • Communication Software
    • Database Management
    • Presentation software
    • Maintenance software
  • RBO
    • PC network
    • Backbone communication equipment (WAN ISDN, Satellite)
    • Communication Software
    • Database Management (including SH database interface)
    • Presentation software
    • Maintenance software


Operation and Maintenance


  • OPERATION:
    • Design Collecting data for metrological & hydrological monitoring (System of hydrology B2.2.3 , B2.2.4)
  • MAINTENACE
    • Power supply monitoring
    • Data transmission quality
    • Programmed maintenance


Inter-relation with other Tasks

  • B 2.2
    • Data exchange design
  • B 2.7.4
    • Existing ATSM stations
  • B2.1.3
    • Implementation phase
  • B 2.12 & B 2.13
    • Technical & Qualitative support